Industrial electricity price: The German Public Accountant’s report

From 10 GWh, your application needs a German Public Accountant’s report. Start in 2026: what your meters miss in 2026 cannot be measured later.

Book a call

free, 25 minutes, price estimate afterwards

Timeline from now

Jannik Hassel, German Public Accountant, signs your report.

Consumption in the application
from 10 GWh
Take meter readings
31 December 2026
Application for 2026
31 March 2027
Submit the report later
31 May 2027

As of 31 October 2026: nos. 5.1 and 6.3.1 of the guideline, BAFA

Industrial electricity price, example: one offtake point claiming 12 GWh, above the 10 GWh threshold: report required.

*

Do you need the report?

A report is needed if both apply:

  • Your sector is eligible.
  • Your application claims at least 10 GWh a year of electricity you use yourself, across all your company’s sites.
Check your sector
Who decides?

Eligible are offtake points whose main activity at year end falls in a sector of the first list in Annex I of the CEEAG (WZ 2008). BAFA decides whether yours does. First list, Annex A of the information sheet (German)

Without the report, your application lacks required proof.

Example calculation of the relief

depends on the auditor’s report
No warranty, no legal claim: assumptions

Industrial electricity price 2026paid afterwards

Directive, BAnz AT 06.05.2026 B1

Non-binding estimate at the 2026 rates: base amount for the consumption entered, before any pro-rata cut and without the flexibility bonus; it assumes an eligible sector.

There is no legal claim; BAFA decides. The estimate is neither an audit opinion nor individual advice, and we give no warranty for it.

  • *€224,640 2026 base amount, example50 % of 12 GWh times 3.744 ct/kWh differential priceBook a call

What does the report confirm?

It states, with reasonable assurance, whether your information per offtake point is free from material misstatement.

Not auditedRelief amount, investment obligation, flexibility bonus

When to start? Now.

  1. NowFirst call, engagement
  2. by 31 December 2026Install missing meters, read on 31 December
  3. from January 2027We audit your figures
  4. 31 March 2027Application to BAFA
  5. 31 May 2027Submit the report later

If you start late

  • MetersUnmetered 2026 volumes count only if admissibly estimated.
  • Cut-off dateYear-end readings and calibration proofs are hard to obtain later.
  • AuditThe report is not automatic: settle the requirements early.

What do you bring?

Request now

  • Grid connection meterCalibration proof from the metering point operator
  • SectorState statistical office certificate, production description

Compile yourself

  • MetersSite plan, meter list with calibration periods, readings, electricity invoices
  • Third-party sub-metersCalibration proof
  • Third partiesContracts reconciled with the books
  • Metering conceptPower flow diagram, responsibilities
  • EstimatesReason, method, inputs per estimate
  • Generation, carbon cost compensationPlant list; claimed volumes or self-declaration

The list is not exhaustive.

Go through it in the call

Who engages and pays the German Public Accountant?

Your company; the guideline provides no reimbursement.

Can the industrial electricity price be combined?

Special equalisation scheme
YesNamed expressly.
Carbon cost compensation
PartlySame year, not the same kilowatt hour.
Individual grid charge
YesNamed expressly (section 19(2) StromNEV).

As of 1 November 2026: information sheet no. 5.4, guideline no. 5.2.2

Your German Public Accountant for the industrial electricity price

“[…] Follow-up questions were answered quickly, and the certificate arrived on time. […]”

Special equalisation scheme, August 2026Excerpt from a client review on KennstDuEinen, translated from German, as of 5 October 2026Read all reviews (opens in a new tab)

Before you engage us

Can we engage you in 2026?

Yes. Before year end we go through power flows, meters and third parties and name gaps; we audit the 2026 figures afterwards. Your company prepares the metering concept and the figures; if we took part beyond the audit, we could not issue the report (section 319(3) sentence 1 no. 3 letter a and (4) HGB, applied correspondingly under no. 6.3.1 of the guideline).

When must the report reach BAFA?

For 2026, the report must reach BAFA with the application by 31 March 2027, or later by 31 May 2027. If you also apply for carbon cost compensation for 2026, application and report may arrive together by 15 July 2027; BAFA names no separate report date for that case.

What does the report cost? Who pays?

Your company engages and pays; the guideline provides no reimbursement of the fee. The fee depends on meters, third parties and estimates, not on the size of the relief. The price estimate follows the first call.

Does our section 55 EnFG certificate suffice?

Not automatically. Groundwork from that audit or from the special equalisation scheme can be used; sector and separation from carbon cost compensation come on top.

Intro call, 25 minutes

Start now

In the free call we settle whether you need the report.

  1. Slot
  2. 25 minutes
  3. Price estimate
Jannik Hassel, German Public Accountant

You always speak directly with a German Public Accountant.no obligation

Next available times

  • Loading available times
Book a call
Prefer email or phone?

+49 211 7407 7093 hello@justreporting.eu

A reply to every e-mail within 48 hours on working days. If it is urgent, say so and we will answer as soon as we can.